1700mm Front Bath Panel For Square L Shape Shower Bath

Online Price £69.99
Out of stock
SKU
WBS300

This 1700mm acrylic front bath panel is suitable for the 1700mm square L shape shower bath. This bath panel can be trimmed to size if the available space for the bath panel has been reduced; i.e. due to tiling.

End bath panel sold separately; please see below for suitable end panel.


  • 1700mm acrylic front bath panel for square L shape shower bath
  • End panel sold separately (please see below)
  • Gloss white finish
  • Bath panel clips sold separately
  • Size: L1695mm x H500mm
  • Supplied with 12 month warranty against manufacturing defects

Reviews

Write Your Own Review
Only registered users can write reviews. Please Sign in or create an account